Seven stages, published in advance.
No black boxes.
Every MNG project follows the same documented methodology. You know the duration, the deliverables, and the QA gate of every stage — before we break ground.
- 01
Planning & Feasibility
4–8 weeksLand due-diligence, soil investigation, FSI analysis, and financial modelling before a single line is drawn.
Deliverables
- Feasibility report
- Soil & survey data
- Budget envelope
- Regulatory map
- 02
Architectural Design
10–16 weeksConcept to construction drawings with structural, MEP, and facade consultants working as one integrated team.
Deliverables
- Concept design
- GFC drawings
- BIM model
- Material specification
- 03
Approvals & Permits
6–12 weeksRERA registration, plan sanction, environmental and fire NOCs — managed end-to-end by our liaison team.
Deliverables
- Sanctioned plans
- RERA registration
- Environmental clearance
- Commencement certificate
- 04
Excavation & Foundation
8–20 weeksShoring, dewatering, piling, and raft foundations — executed with third-party verification at every pour.
Deliverables
- Pile load tests
- Foundation QA records
- Waterproofing certificates
- As-built survey
- 05
Superstructure
Floor cycle: 7–10 daysAluminium formwork systems and disciplined floor cycles that keep towers rising on a published schedule.
Deliverables
- Cube test registers
- Cycle-time reports
- Alignment surveys
- Rebar inspection logs
- 06
MEP & Finishing
Parallel · 24 weeksServices and finishes run in parallel with structure — pressure-tested, megger-tested, and mock-up approved.
Deliverables
- Pressure test records
- Mock-up sign-offs
- Finish schedules
- Snag registers
- 07
Quality, Handover & Aftercare
4–8 weeks + 60-month warrantyA 240-point QA checklist per unit, documented handover, and a structural warranty that runs for five years.
Deliverables
- QA clearance
- Handover dossier
- O&M manuals
- 60-month warranty card