Back to projects
CompletedResidential
Bala Residency
Modern housing blocks designed for student and faculty luxury comfort.
Location
SRM Campus, Potheri
Area
120,000 sq ft
Scope
Turnkey development · 5 floors
Timeline
2022 – 2024
Completion
Completed Q3 2025
Construction Progress
100% complete overall.
Stage-wise progress, updated from site inspection records. What we publish is what our engineers sign.
Overall progress
100%
Estimated completion: Completed Q3 2025
Six construction stages
01Foundation
100%02Structure
100%03Roofing
100%04Electrical & Plumbing
100%05Finishing
100%06Handover
100%Specification
Materials & specifications.
Brand-locked at contract. Verified at delivery. Documented at handover.
| Structure | RCC framed structural framework, M40 concrete mix |
|---|---|
| Reinforcement | ARS 550D TMT reinforcement steel |
| Doors | Teak Wood entrance door, flush interior doors |
| Windows | UPVC double-track soundproof windows |
| Electrical | Orbit FRLS cables, Anchor modular switchgear |
| Sanitary | Parryware sanitary fittings, Astral piping system |
Amenities
Student loungeFitness centerHigh-speed Wi-Fi networkEV charging points
Project Showcase
Site Gallery & Walkthrough
Visual records of the completed structural landmarks and finishing details.
Site Gallery

1 / 3
Bala Residency — Site GalleryUse arrows to navigate
Interested in Bala Residency?
A principal engineer will walk you through drawings, specifications, and timelines — within 48 hours.