MNG Constructions
Bala Residency in SRM Campus, Potheri
Back to projects
CompletedResidential

Bala Residency

Modern housing blocks designed for student and faculty luxury comfort.

Location

SRM Campus, Potheri

Area

120,000 sq ft

Scope

Turnkey development · 5 floors

Timeline

2022 – 2024

Completion

Completed Q3 2025

Construction Progress

100% complete overall.

Stage-wise progress, updated from site inspection records. What we publish is what our engineers sign.

Overall progress
100%

Estimated completion: Completed Q3 2025

Six construction stages

01Foundation
100%
02Structure
100%
03Roofing
100%
04Electrical & Plumbing
100%
05Finishing
100%
06Handover
100%
Specification

Materials & specifications.

Brand-locked at contract. Verified at delivery. Documented at handover.

Materials and specifications for Bala Residency
StructureRCC framed structural framework, M40 concrete mix
ReinforcementARS 550D TMT reinforcement steel
DoorsTeak Wood entrance door, flush interior doors
WindowsUPVC double-track soundproof windows
ElectricalOrbit FRLS cables, Anchor modular switchgear
SanitaryParryware sanitary fittings, Astral piping system

Amenities

Student loungeFitness centerHigh-speed Wi-Fi networkEV charging points
Project Showcase

Site Gallery & Walkthrough

Visual records of the completed structural landmarks and finishing details.

Site Gallery

Bala Residency photo 1
1 / 3
Bala Residency — Site Gallery

Interested in Bala Residency?

A principal engineer will walk you through drawings, specifications, and timelines — within 48 hours.