CompletedResidential
Prasana Court
Compact residential blocks optimized for comfort and natural light.
Location
Perumattunallur, Chennai
Area
72,000 sq ft
Scope
Design–build · Residential apartments
Timeline
2023 – 2024
Completion
Completed Q4 2024
Construction Progress
100% complete overall.
Stage-wise progress, updated from site inspection records. What we publish is what our engineers sign.
Overall progress
100%
Estimated completion: Completed Q4 2024
Six construction stages
01Foundation
100%02Structure
100%03Roofing
100%04Electrical & Plumbing
100%05Finishing
100%06Handover
100%Specification
Materials & specifications.
Brand-locked at contract. Verified at delivery. Documented at handover.
| Structure | RCC framed structure, M40 concrete mix |
|---|---|
| Reinforcement | ARS 550D TMT reinforcement steel |
| Doors | Teak Wood main entrance, flush doors inside |
| Paint | Nippon Washable interior, Asian exterior paint |
| Electrical | Orbit FRLS cabling, Anchor switches |
| Sanitary | Parryware sanitaryware, Astral piping |
Amenities
Covered parkingRO water treatmentElevator liftTerrace space
Project Showcase
Site Gallery & Walkthrough
Visual records of the completed structural landmarks and finishing details.
Site Gallery

1 / 46
Prasana Court — Site GalleryUse arrows to navigate
Interested in Prasana Court?
A principal engineer will walk you through drawings, specifications, and timelines — within 48 hours.