Back to projects
CompletedIndustrial
Saravanan Tech Space
A structural PEB assembly facility optimized for industrial warehouse logistics.
Location
Tharkash, Chennai
Area
165,000 sq ft
Scope
Industrial warehouse design & EPC
Timeline
2022 – 2024
Completion
Completed Q3 2024
Construction Progress
100% complete overall.
Stage-wise progress, updated from site inspection records. What we publish is what our engineers sign.
Overall progress
100%
Estimated completion: Completed Q3 2024
Six construction stages
01Foundation
100%02Structure
100%03Roofing
100%04Electrical & Plumbing
100%05Finishing
100%06Handover
100%Specification
Materials & specifications.
Brand-locked at contract. Verified at delivery. Documented at handover.
| Structure | PEB structural steel, 28m clear spans |
|---|---|
| Foundation | RCC pedestal columns, M45 concrete |
| Flooring | Laser-screed warehouse flooring, 6T loading |
| Roofing | Double skin insulated roofing sheet |
| Electrical | Orbit FRLS wires, industrial GM switchgear |
| Sanitary | Parryware fittings, storm drains Astral |
Amenities
Hydraulic dock levellersTruck loading baysCommand centerDriver rest block
Project Showcase
Site Gallery & Walkthrough
Visual records of the completed structural landmarks and finishing details.
Site Gallery

1 / 22
Saravanan Tech Space — Site GalleryUse arrows to navigate
Interested in Saravanan Tech Space?
A principal engineer will walk you through drawings, specifications, and timelines — within 48 hours.